Part of Intro to Industrial Wastewater Treatment.
A single sample on a quiet Tuesday is not a design basis. Industrial wastewater is defined by the range: normal production, cleaning day, start-up and the worst hour.
| Parameter | What it tells you |
|---|---|
| BOD | Biochemical oxygen demand. Organic matter that bacteria can break down. The part of the load a biological plant can eat. |
| COD | Chemical oxygen demand. Almost all organic matter, biodegradable or not, plus some inorganic reducing agents. Faster to measure than BOD. |
| BOD/COD ratio | A rule of thumb for treatability. A high ratio, often around 0.5 or more, usually means biology is realistic. A low ratio means much of the COD will pass through a biological stage and may need chemical or advanced treatment. |
| TSS | Total suspended solids. Particles that screening, settling, flotation or filtration can catch. Dissolved load is not TSS. |
| FOG | Fat, oil and grease. Floats, coats sensors, blinds biomass and fouls sewers. Free oil and emulsified oil need different steps. |
| Heavy metals | Copper, nickel, zinc, chromium, lead, cadmium and others. Toxic to biology and to receiving waters. Usually removed by precipitation or selective polishing, not by bacteria. |
| Nutrients | Nitrogen and phosphorus. Too much, and the permit fails. Too little relative to BOD, and the biomass starves and treatment needs a nutrient dose. |
| TDS | Total dissolved solids. Salts and other dissolved matter. Biology, reuse and discharge limits all feel TDS. Membranes move salt into a concentrate; they do not destroy it. |
| Specific toxins | Cyanide, phenols, solvents, pesticides, active pharmaceutical ingredients, sulfide. A small stream can make a large biological plant fail. |
| pH and temperature | CIP acids and caustics, pickling and dyeing. Hot condensate and pasteuriser water. Both can be corrected, and both can wipe out a biological stage if they arrive as a slug. |
Flow and load are part of the water chemistry
Factories do not emit a steady average. A cleaning dump can send a day’s chemical load in twenty minutes. A campaign change can switch the wastewater from one recipe to another. Rain on a contaminated yard can double the flow.
Design and permits care about peaks as well as averages. Equalisation exists because of that. So does the practice of holding a bad batch in a tank instead of sending it straight through.