Preliminary and Pretreatment

Part of Intro to Industrial Wastewater Treatment.

Pretreatment is everything required so the main process sees water it can handle. On a sewer discharge, “pretreatment” is also the legal name for what a factory must do before the municipal plant.

Screening

Bar screens and fine screens catch rags, labels, plastic, peel, feathers, fibres and packaging. The screen is chosen for the product, not copied from a municipal inlet. What passes the screen becomes a pump blockage, a rag in a membrane, or a blanket on a clarifier.

Grit removal

Sand and grit matter when raw materials, yards or stormwater can reach the drain. A closed process stream may have almost none. Grit that is left in wears pumps and fills tanks with material that will not digest.

Equalisation

This is the industrial step that saves the rest of the plant. A mixed tank evens out flow, pH and concentration so dosing and biology see a day instead of a slug. Mixing is required. Aeration is added when the tank would otherwise turn septic. Equalisation is a buffer. It is not, by itself, the treatment.

Oil and water separation

Free oil is separated in a gravity separator (API) or on coalescing plates (CPI). Emulsified oil does not separate that way. It needs the emulsion broken, then flotation. See flotation (DAF / IAF). Fat from food plants is the same family of problem: it blinds biomass and coats pipes if it is left for the biological stage to “sort out”.

Other pretreatment that belongs here

  • Cooling, when the stream is hot enough to harm biology or exceed a sewer temperature limit
  • Nutrient dosing, when BOD is high and nitrogen or phosphorus is scarce
  • Chromium(VI) reduction, or cyanide oxidation, on metal-finishing lines before metals are precipitated
  • pH trim, so the next chemical step sits in the range where it actually works
  • Holding and testing a bad batch, instead of diluting it into the main flow