Water Reuse and Zero Liquid Discharge (ZLD)

Part of Intro to Industrial Wastewater Treatment.

Reuse keeps a treated stream inside the site. The quality target is the next duty, which may be stricter than the discharge permit or much looser. Cooling makeup, floor wash, a dirty rinse and a boiler are four different specifications.

Closed loops and recycling

  • Cascade reuse. The last, cleaner rinse returns as make-up to a dirtier rinse. Often the highest water saving for the least new equipment.
  • Utility reuse. Polished effluent as cooling makeup, or as lower-grade wash water, when salt, nutrients and microbiology are acceptable there.
  • Process reuse. Back into product contact only when the process specification is met. Food and pharma duties are tighter than a discharge permit.
  • A closed loop with a purge. Water circulates and a smaller stream leaves so that salt and inert COD do not climb forever. The purge is still wastewater, and it is usually more concentrated than the old discharge.

The broader picture, including the water reuse guide, sits beside this page. A separate tool, the Water Reuse Risk Assessment Tool, is a way to compare a proposed reuse with the quality of the source stream.

When zero liquid discharge makes sense

ZLD means no wastewater leaves the site as a liquid. A typical end of train is high-recovery membranes, then an evaporator, then a crystalliser. Water returns as condensate. Salt leaves as a solid. Energy use is high. Mechanical vapour recompression is the usual way to cut evaporator energy, and it is still far more energy than a biological plant.

ZLD earns its cost when discharge is forbidden, when water is scarce enough that the energy is justified, or when the residual volume is small and the solid has a home. It is a poor default for a large, dilute, biodegradable stream that can meet a permit with biology. Membranes and evaporators also do not make salt disappear. They decide whether the salt leaves as a brine or as a solid.

Back to the knowledge centre